4.1.2
Installation Procedure
Table 4-1
HiPath 3800 - Installation Procedure
Step
Installation Activity
Installing HiPath 3800 (Standalone)
Installing HiPath 3800 (19-Inch Cabinet)
1.
Selecting the Installation Site, page 4-4
(usually predetermined)
Selecting the Installation Site, page 4-20
(generally determined by the existing 19-inch cabinet)
2.
Unpacking the Components, page 4-6
Unpacking the Components, page 4-23
3.
Setting up the System Cabinets (from
Page 4-7
):
Single Cabinet
Two cabinets (stacked)
Two cabinets (side by side)
Mounting System Cabinets in the 19-Inch Cabinet, page 4-24
4.
Grounding the System, page 4-14
Checking the Grounding, page 4-19
Grounding the System, page 4-27
Checking the Grounding, page 4-30
5.
Installing Boards (Configuration Notes), page 4-31
6.
Connecting the Cable to the Backplane, page 4-51
7.
If required: use an external main distribution frame or external patch panel,
from
Page 4-66
:
•
Main Distribution Frame MDFU-E
•
Patch Panel S30807-K6143-X
•
S
0
Patch Panel C39104-Z7001-B3
8.
Loading the System Software and Installing Subboards on the CBSAP, page 4-81
9.
Connecting Workpoint Clients, page 4-82
10.
Making Trunk and Networking Connections, page 4-82
11.
Performing a Visual Inspection, page 4-83