4.1.8 |
Loading the System Software and Installing Subboards on the CBSAP |
|
| The boards should be installed in the cabinets as described in Section 4.1.5 "Installing Boards (Configuration Notes)". |
| The central control boards are not always fully equipped when delivered. Optional plug-in boards are packaged individually. |
| See Section 3.2.3 "CBSAP" for information on slots for subboards on the central control board CBSAP. |
|
| HiPath 3000/5000 V9, Service Documentation, Issue 10 | up ![]() |
|
![]() |
||
| Disclaimer & Copyright | ID: P31003H3590S100017620 | 2014-02-27 |