|
Table 4-9
|
Visual inspection procedure
|
|
|
|
|
|
|
|
| Compare the slots of the available boards with the component mounting diagram.
|
|
|
| If necessary, correct the board configuration and notify the sales department.
|
|
|
|
| Check that all boards are secure.
|
|
|
| If necessary, plug the boards in again.
|
|
|
|
| Check that a shielding cover has been attached for all boards with no connection options in the front cover.
|
|
|
| If necessary, replace missing shielding covers (refer to Seite 4-35).
|
|
|
|
| Check whether the slots for LUNA2 and for REALS (basic cabinet only) are covered by an outer panel.
|
|
|
| If necessary, attach the outer panel (see Seite 4-37).
|
|
|
|
| Check whether all system cabinets have been sealed at the rear with the connection and filler panels provided.
|
|
|
| Get additional connection and filler panels where required.
|
|
|
|
| Check whether a separate grounding is connected to the main grounding terminals of all system cabinets.
|
|
|
| If necessary, ground the system as described in the following sections:
|
|
|
|
| Check the local supply voltage.
|
|
|
|
|
|
| Only for installing HiPath 3800 as a standalone system:
|
| close all system cabinets with the front and back plastic covers provided.
|
|
|
Fit the cover into the guides and press down on the cover unit it snaps into place.
|
|