4  

Installing HiPath 3000 
 

Chapter contents  
This chapter covers the following topics:

 Topic  
Installing HiPath 3800, page 4-2  
 •   Installation Prerequisites, page 4-2
 •   Installation Procedure, page 4-3
 •   Installing HiPath 3800 (Standalone), page 4-4
 •   Installing HiPath 3800 (19-Inch Cabinet), page 4-20
 •   Installing Boards (Configuration Notes), page 4-31
 •   Connecting the Cable to the Backplane, page 4-50
 •   Using an External Main Distribution Frame or External Patch Panel, page 4-65
 •   Loading the System Software and Installing Subboards on the CBSAP, page 4-80
 •   Connecting Workpoint Clients, page 4-81
 •   Making Trunk and Networking Connections, page 4-81
 •   Performing a Visual Inspection, page 4-82
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300, page 4-84  
 •   Installation Prerequisites, page 4-84
 •   Installation Procedure, page 4-85
 •   Installing HiPath 3550 and HiPath 3350, page 4-86
 •   Installing HiPath 3500 and HiPath 3300 (19-Inch Housing), page 4-108